RichWeld Fabrication Inc.

About This Project

Richweld Fabrication recently completed a massive floating sewage digester lid for the City of Hastings. This vital municipal project directly supports the process of anaerobic digestion—the biological degradation of organic matter in the absence of oxygen. By capturing the chemical energy in organic carbon and converting it into biogas, this infrastructure turns wastewater sludge treatment into a sustainable resource recovery operation. Richweld’s heavy-duty fabrication ensures a completely gas-tight environment, playing a critical role in reducing the facility’s overall energy footprint and maximizing green energy recovery.

Description :

The 1-Ton Milestone: Burning through over 2,000 pounds of welding stick underscores the massive structural scale of this municipal asset. Every single inch of weld was laid with consistent, high-penetration uniformity to ensure the lid acts as a single, indestructible unit when deployed.

By combining heavy industrial capacity with precision-driven craftsmanship, Richweld successfully delivered a robust, long-term infrastructure solution that ensures the City of Hastings Pollution Control Facility can continue managing municipal waste safely, efficiently, and reliably for decades to come.

Client :

Sewer- City of Hasting Nebraska

Category :

Large scale, Municipal, Community,

Chat with us

Have a project in mind? Give us a call (402) 462-2086