RichWeld Fabrication Inc.

About This Project

Precision Reactor Rebuild for Hi-Line Co-op In Grant, Nebraska. Featuring absolute precision across hundreds of critical join points. The core of this rebuild involved a complex internal tube configuration that is vital for the reactor’s heat exchange and processing capabilities.

Description :

This project has 180 individual tubes running through the center of the unit. Every single tube required a high-integrity weld on both ends, totaling 360 individual welds. Beyond the physical labor, the most rewarding part of this project was the final verification. We are proud to report that the unit has passed all leak tests with flying colors.

Client :

Hi-Line CO-OP in Grant, Nebraska

Category :

High-Precision Stainless Steel TIG Welding